Implemented projects – energetics

Hydro-power plants Completed Projects

Construction of mini hydro-power plant “SAMOKOVO” on Gobeljska reka

The works were initiated in August 2014 and completed 4 months before term, in July 2015. The successful commissioning was performed in early August 2015.

The hydro-technical system of MHPP SAMOKOVO consists of the water intake with the settling tank, derivational pipeline of 1660m and Machine Building with the canal for the connection with the tail water.

samokovo

The top quality electrical equipment with the complete system management during the exploitation:

samokovo2

SHPP Djorov most, Samokovska river

djorov-most

Reference list in the field of energy and control systems for wind turbines:

Completed Objects

  • Development of technical specifications of electrical power equipment for PRP and TS (power transformer station) 220/33kV of the Kovačica Wind Farm as part of the preparation of tender documentation for the construction of the Kovačica Thermal Power Plant
  • Revision of project documentation, selection of power equipment and harmonization of documentation in accordance with internal EMS standards for the PRP Kovačica Wind Farm
  • Configuring, parameterizing, tuning study testing and commissioning (FAT, SAT) of relay protection, own consumption; SAT switches, disconnectors, metering transformers PRP Kovačica Wind Farm
  • Preparation of documentation and conducting tests of conformity of operation of the Kovačica Wind Farm with the rules on the operation of the transmission system
  • Revision of project documentation, selection of power equipment and harmonization of documentation in accordance with the internal EMS standards for PRP 400kV Wind Farm Dolovo
  • Configuring, parameterizing, tuning study testing and commissioning (FAT, SAT) of relay protection, own consumption; SAT switches, disconnectors, metering transformers PRP 400kV Dolovo Wind Farm
8

Reference list in the field of energy and control systems of hydro-power plants:

Completed Objects

  • Configuration, parameter setting, testing and commissioning of the relay protection of the Vrgudinac SHPP
  • Configuration, parameter setting, testing and commissioning of the relay protection of SHPP Seljašnica
  • Configuration, parameter setting, testing and commissioning of the relay protection of SHHP Turica
  • Configuration, parameter setting, testing and commissioning of relay protection on a 6kV plant for own consumption of HPP Đerdap 2
9

Reference lists in the field of energy and control systems:

Completed Objects

  • Design, replacement, testing and commissioning of relay protection of the TS (power transformer station) 35/10kV Kanarevo brdo
  • Design, replacement, testing and commissioning of relay protection of TS (power transformer station) 35/10kV Novi Beograd 3
  • Configuration, parameter setting, testing and commissioning of relay protection of TS (power transformer station) 110/20kV Krnješevci
  • Configuration, parameter setting, testing and commissioning of relay protection of EVP Slovac and 4 PS
  • Configuring, parameter setting, testing and commissioning of relay protection of EVP Resnik
  • Functional testing at the BWE6600 Excavator Kolubara
  • Annual overhaul of 7 TS (power transformer station) 110/35/10kV PD Center Kragujevac
  • Bosch Plant Relay Protection Adjustment Study
  • Adjustment Study of the relay protection of “Beogradske elektrane” 6kV plant
  • Testing of relay protection at 110kV, 35kV, 6 kV plants as part of the annual overhaul of PE “Beogradske elektrane”
10

“Ras Eco Energy doo” Partners:

„Elektrozapad“ doo –  elektrozapad.com